Choose your country
Go to your local Sikla page and discover offers for your country or sales region:
Country
300-200

550-350

7254-400

880-550



Group: 1326
Tie Rods absorb transverse forces from Support Brackets, especially in sliding elements.
Installation of Tie Rods prevents the Support Brackets from being torn out by shear forces.
Tie Rods cater for the lateral forces applied to Support Brackets. Such lateral forces always occur when pipes are laid, in particular when sliding elements are fixed onto Support Brackets, and fett must /fett be safely absorbed by means of Tie Rods fixed to the brackets. Otherwise the Support Brackets run the accute risk of being pulled out of their anchoring components by the forces exerted.
Certification

Material base body | steel |
Surface | HCP |
Corossion class | C4 |
Type | -VZ,perm. | VZ,perm. |
STR 300/200 HCP | 7,00 kN | 7,00 kN |
STR 550/350 HCP | 7,00 kN | 7,00 kN |
STR 725/400 HCP | 12,00 kN | 12,00 kN |
STR 880/550 HCP | 12,00 kN | 12,00 kN |
Software
This product is available in the following software.

Fix the Tie Rod to the bore especially made for such purpose at the overhanging leg of the Support Bracket using the recommended hexagon bolt (see table).
| Type | Recommended bolt for attachement to Support Bracket | Installation dimension A | Pipe |
|---|---|---|---|
| 300/200 | M10 x 80 | 210 | 1/2" |
| 550/350 | M10 x 80 | 365 | 1/2" |
| 725/400 | M10 x 100 | 400 | 3/4" |
| 880/550 | M10 x 100 | 550 | 3/4" |
Info | Type | Weight | Quantity | Part number | |
| STR 300/200 HCP | 0,319 kg/pcs. | 10 pcs. | 125967 | ||
| STR 550/350 HCP | 0,524 kg/pcs. | 10 pcs. | 125994 | ||
| STR 725/400 HCP | 0,906 kg/pcs. | 10 pcs. | 151908 | ||
| STR 880/550 HCP | 1,306 kg/pcs. | 10 pcs. | 151892 | ||