Group: 1308
Quick-installation element for efficiently mounting pipe clamps and other components to all Sikla Channels of the 41 series, suitable for double channels also.
Pre-assembled
Insert the Block into the channel; by turning the Holding Bracket by 90° to the right, the Channel Nut locks into the stop position; then tighten nut or other connecting part with torsional moment (M) of max. 40 Nm - the job is done!
| Min. material thickness Channel 41 [mm] | FZ * [kN] | FQ * [kN] |
|---|---|---|
| 1.5 | 4.7 | 2.0 |
| 2.0 | 5.8 | 2.0 |
| ≥ 2.5 | 5.8 | 2.0 |
Perm. load FZ * under stress of fire
| Min. material thickness Channel 41 [mm] | FWD 30 [N] | FWD 60 [N] | FWD 90 [N] | FWD 120 [N] |
|---|---|---|---|---|
| 2.0 | ≤ 850 | ≤ 430 | ≤ 250 | |
| ≥ 2.5 | ≤ 1000 | ≤ 540 | ≤ 350 | ≤ 250 |
FZ = max. permissible tensile load
FQ = max. permissible lateral force against displacing
* The load capacity of the connecting parts used is to be considered. This applies particularly under stress of fire.
| Material: | Steel, electro-galvanised |
| Type | W [kg] |
Quantity [pack] |
Part number |
|---|---|---|---|
| M8 | 0.05 | 50 | 198988 |
| M10 | 0.05 | 50 | 198995 |
| M12 | 0.05 | 50 | 199008 |